This product is suitable for an oil layer that can be exploited in three different formations or three different sections in one hole
There are three separate wellhead devices in a single conductor
Each wellhead can be installed independently and does not affect each other
Effectively reducing the number of mining platforms and reducing the development cost of the platform
The tubing hanger can cross the double cable traverser and continuous control line port
The block tree reduces the height and size of the installation and increases the reliability of the sealother
Maintaining stability, reliability and long service life for long term work